Lach Huyen Port Infrastructure construction project (Hai Phong, Vietnam)


Project Information:
  • Period:January 1, 2017
  • POL:Dong Nai
  • POD:Hai Phong Port
Brief Information
Transport steel pipe piles (17-30m) from factory in Dong Nai to jobsite in Hai Phong
Technical Specs:
  • Steel Pipe Piles, Length: 17-30m, OD: 800-1100mm
  • Total: 1,228 pcs / 9,500 tons
Scope of Works:

Trucking from Factory to port of loading in Dong Nai

Loading from trailer onto vessel

Inserting dunnage and lashing on vessel

Transport from Dong Nai Port to Hai Phong Port

Unloading from vessel onto trailer

Trucking from Hai Phong port to Jobsite

 