Flood Control Management Project in Ho Chi Minh City, Vietnam (Phase 1)


Project Information:
  • Period:January 1, 2019
  • POL:Ba Ria Vung Tau
  • POD:Ho Chi Minh
Brief Information
Transport Steel Pipe Piles (27.5 – 43.5m) from Factory in Ba Ria – Vung tau province to Jobsite in Ho Chi Minh City
Technical Specs:
  • Steel Pipe Piles, OD 1200mm, Length: 62.5m
  • Total: 23,500 tons
Scope of Works:

Trucking from Factory to Port of Loading in Ba Ria Vung Tau province

Loading from trailer onto barge

Inserting dunnage and lashing on barge

Transport fro Port of loading to jobsite

 

As a member of

opcawhitelogo copy

We are always open for any kind of cooperation and looking for new promising projects

logo-color

Copyright © 2024 Infinity Logistics. All Rights Reserved.