Project Information:
  • Period:July 31, 2021
  • POL:Quy Nhon Port
  • POD:Phu My, Ba Ria Vung Tau
Brief Information
Transport 12 sets of wind turbine’s blades by barge for the project of HBRE Chu Prong WPP
Technical Specs:
  • Blades’ length: 76.3m, width: 4.95m, height: 3.4m
  • Quantity: 36 units of blades
Scope of Works:

Loading blades at port

Dunnage and lashing for blades on specialised barge

Transport blades by barge from Quy Nhon Port, Binh Dinh Province to Phu My, Ba Ria Vung Tau province

Then we will do inland trucking for these blades from Phu My to the Project site for erection, which helped complete the turbines’ equipment so as for the wind power plant to operate in time.