Transport Steel pipe Piles from factory in Ba Ria Vung Tau province to Jobsite in Binh Thuan province
One of four thermal power plants to be built in the central province of Binh Thuan, the largest national thermal power centre in Vietnam
INVESTOR: China Southern Power Grid Co., LTD & China Power International Holding Ltd, Vietnam National Coal-Mineral Industries Holding Co., LTD (Vinacomin)
INVESTED CAPITAL: $1.7 billion
CONSTRUCTION PERIOD: 2015-2019
- Trucking from Factory to port of loading inBa Ria Vung Tau province
- Loading from trailer onto barge
- Inserting dunnage and lashing on barge
- Transport from ODA Port to jobsite
Steel Pipe Piles, length 29-39m, OD 900-1000mm, total 570 pieces / 7,900 tons