Flood Control Management Project in Ho Chi Minh City, Vietnam (Phase 1)

Transport Steel Pipe Piles (27.5 - 43.5m) from Factory in Ba Ria - Vung tau province to Jobsite in Ho Chi Minh City

Client: Ho chi minh City
Time: MAR 29, 2019
Home » Infrastructure

Brief Information:

Construct six large sluice gates and three water pumping stations to control flooding caused by tide in a 570 square kilometer area that houses around 6.5 million residents in the city center and along the Saigon River
INVESTOR: Trung Nam Construction Investment Corporation
INVESTED CAPITAL: VND 10 trillion
CONSTRUCTION PERIOD: 2016-2019

Scope of works:

- Trucking from Factory to Port of Loading in Ba Ria - Vung Tau province
- Loading from trailer onto barge
- Inserting dunnage and lashing on barge
- Transport fro Port of loading to jobsite

Technical specifications:

Steel Pipe Piles, OD 1200mm, Length: 62.5m
Total: 23,500 tons

Project Details:

vận chuyển ống dài quá khổ cho dự án chống ngập tphcm

vận chuyển ống dài quá khổ cho dự án chống ngập tphcm

vận chuyển hàng dài quá khổ quá tải

vận chuyển hàng dài quá khổ quá tải

vận chuyển hàng dài quá khổ quá tải

vận chuyển ống dài quá khổ cho dự án chống ngập tphcm

vận chuyển ống dài quá khổ cho dự án chống ngập tphcm

vận chuyển ống dài quá khổ cho dự án chống ngập tphcm

SEND A REQUEST

Fill an request form to get more details about our services and our capabilities.